Hot pole changeouts – reconductoring
25 miles of 69 KV Transmission Line New Construction
115/69 KV Verona Substation and 69 KV distribution line (11 miles)
Various Projects: Hot line pole change outs; reconductoring, and storm repair work.
Hot pole changeouts – reconductoring
25 miles of 69 KV Transmission Line New Construction
115/69 KV Verona Substation and 69 KV distribution line (11 miles)
Various Projects: Hot line pole change outs; reconductoring, and storm repair work.